Qassim Cement Company, Burayadh, Saudi Arabia
ABOUT PROJECT
Limestone Stacker PL-1 & PL-2
1985 : Commissioned by MVT , Germany for 1800 TPH
2005 : Capacity Up-graded by IHI Japan from 1800 to 2200 TPH
2015 : Tech Audit by Lepton:-Final Report Submitted in May 2015
2015 : Phase-1: Rehabilitation of Limestone Stacker, including the replacement of Critical component of the Stacker with new, improved design component in 24d after it collapsed in Sep 2015
2016 : Phase-2: Design, Manufacturing & Supply of Improved Long Travel Mechanism (With Bogie Design, in place of BG Design) complete with drive units and VFD & Drive Pulley with Ceramic Lagging.
OBJECTIVE ACHIEVED
- Achieved the up-graded Capacity of 2200 TPH
- Reduce the Load on the Cracking Civil Foundation
- Minimize the wear of the Rail
- Over-speeding of the Reclaimer Controlled
- Improved reliability of Stacker